[caption id="attachment_3707" align="alignright" width="488"]
Temporary Distribution Equipment construction site Three-level temporary distribution box temporary power cabinet[/caption]
[caption id="attachment_3708" align="alignright" width="488"]
Temporary Distribution Equipment construction site Three-level temporary distribution box temporary power cabinet[/caption]
[caption id="attachment_3709" align="alignright" width="488"]
Temporary Distribution Equipment construction site Three-level temporary distribution box temporary power cabinet[/caption]
[caption id="attachment_3710" align="alignnone" width="488"]
Temporary Distribution Equipment construction site Three-level temporary distribution box temporary power cabinet[/caption]
Our factory
Can we use our own logo?
S: Yes, if you have requirements, we can customize the logo you need according to your requirements
When can delivery from ordering?
S: The delivery time depend on the quantity you ordered, generally about 15-25 days after deposit of payment.
Can we customise the product size?
S:Yes. We need your drawings in CAD, 3D or PDF. Or you send us your sample, we draw for you.
According to the needs of the operating conditions, we can install AC input reactor, output reactor, DC reactor, EMI filter, braking unit, breaking resistor, contactor, intermediate relay, thermal relay, PLC, HMI , Electricity meter , cooling fan and ect inside the control cabinet .
Safety protection .Install the VFD in the frequency control panel, can reduce environmental pollution, reduce the risk of electric shock, will have better protective effect.
Neat and beautiful appearance. install the VFD in the frequency control panel, have the same size with other low -voltage switchgear .the same color ,to maintain the power distribution facilities and control equipment coordination, neat, beautiful.